ENERGY
GENERATION

The power of the SAER multi-stage PAT helps the mining operator reduce the amount of grid electricity imported

The PAT was installed in parallel with an existing pressure reduction station on a DN 150 pipe which transports cooling water from the surface down to the bottom of the mine.
The turbine is located 300 m under ground.
Instead of dissipating the water pressure in the form of heat and noise, the E-TMZ multi-stage PAT generates power which helps the mine operator reduce the amount of grid electricity they need to import.

Image

THE PROJECT IN BRIEF

COUNTRY

Ireland

APPLICATIONS

Special project

PRODUCTS
CATEGORY

Multi-stage pumps

PRODUCT
USED

E-TMZ-4P-50-80

QUANTITY

1