SAER - design and construction of a pumping station in Algeria
Long-term supply of drinking water (2050) for the population of Setif and municipalities to the west of Wilaya from the Mahoune dyke.
Design and construction of a pumping station and two boosters including installation of hydro- and electro-mechanical, electrification, remote management and system protection equipment.
THE PROJECT IN BRIEF
COUNTRY
APPLICATIONS
PRODUCTS
CATEGORY
Multi-stage pumps
Multi-stage pumps
End suction
PRODUCT
USED
TMB125-200/4
TMB125-200/4
NCBKZ 4P 200-315C
POINTS
OF WORK
Q= 242 m³/h H= 113 m
Q= 242 m³/h H= 114 m
Q= 585 m³/h H= 17m
QUANTITY
3
3
3